Skip to main content

Table 3 Electrical input power per wall plug: control electronics (CE), chip&coil current and titanium sublimation pump (CCC/TSP), rubidium laser system (LS-Rb), and potassium laser system (LS-K). Due to the usage of capacitors, the electrical peak power consumption does not occur in the same experimental phase as the peak heat dissipation listed in tab. 4

From: The Bose-Einstein Condensate and Cold Atom Laboratory

State (W) CE (W) CCC/TSP (W) LS-Rb (W) LS-K (W) Total power (W)
Cold standby 144 0 0 0 144
Hot standby 324 84 318 340 1066
Capacitor charging 324 485 318 340 1467
Experiment operation 324 84 318 340 1066
Avg. charging + operation 324 285 318 340 1267
Ti-sublimation pump 144 372 0 0 516
\