Skip to main content

Table 3 Electrical input power per wall plug: control electronics (CE), chip&coil current and titanium sublimation pump (CCC/TSP), rubidium laser system (LS-Rb), and potassium laser system (LS-K). Due to the usage of capacitors, the electrical peak power consumption does not occur in the same experimental phase as the peak heat dissipation listed in tab. 4

From: The Bose-Einstein Condensate and Cold Atom Laboratory

State (W)

CE (W)

CCC/TSP (W)

LS-Rb (W)

LS-K (W)

Total power (W)

Cold standby

144

0

0

0

144

Hot standby

324

84

318

340

1066

Capacitor charging

324

485

318

340

1467

Experiment operation

324

84

318

340

1066

Avg. charging + operation

324

285

318

340

1267

Ti-sublimation pump

144

372

0

0

516